Port of Tacoma – RFQ – North Intermodal (NIM) Yard Tower Operations Relocation 2024 072111 – Due 5/21/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
2d ago
Due Date: May 21, 2 PM Procurement Summary: The Northwest Seaport Alliance (NWSA) is soliciting Statements of Qualifications (SOQ) from firms qualified and interested in providing professional consulting services for the North Intermodal (NIM) Yard Tower Operations Relocation Project. This project will relocate the current operations located at the NIM tower to an alternate location either on the NIM rail yard or at an alternate off yard location. It is anticipated that the new facility will be fully operational by December 31, 2026. The submitting firm/team shall have experience in plann ..read more
Visit website
City of Tacoama – RFB – Tacoma Rail Vegetation Management – Due 04/24/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
6d ago
Due Date: April 24, 11 AM Project Scope: Tacoma Rail Vegetation Management Estimate: $78,500 Click here for more information The post City of Tacoama – RFB – Tacoma Rail Vegetation Management – Due 04/24/24 first appeared on Washington MBDA Business Center ..read more
Visit website
City of Tacoma – RFB – Tree Removal and Pruning ES23-0280F – Due 04/30/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
6d ago
Due Date: April 30, 11 AM Pre-Proposal Meeting: A pre-proposal meeting will not be held. Project Scope: The City of Tacoma (City) is soliciting bids to establish one or more contracts with qualified vendors to fulfill the City’s needs for Tree Pruning and Removal. Contract(s) will be awarded to the lowest responsive and responsible bidder(s) based on price, quality and availability. The work performed under this contract shall consist of removing trees and pruning existing trees. The work sites are located in the public rights-of-way, or City real property such as open space, urban forests, pa ..read more
Visit website
Absher Construction RFB – Wenatchee Valley College Center for Education & Innovation – Due 4/30/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
6d ago
Due Date: April 30, 1 PM Description: This is a 69,980 SF 2-story structure for Wenatchee Valley College for the Center for Technical Education and Innovation that is comprised largely of steel, masonry and concrete and includes classroom space as well as lab space for mechatronics, automative, welding, machining, refrigeration, natural resources, agriculture, computer technology, greenhouses, etc. This is a Prevailing Wage project. Project Subcontracting Goals: MBE 10%, WBE 6%, SB 5%, Veteran 5% Pre-Bid Meeting: April 16, 2024, 10:00 a.m. Contact: Jeremy.Ackerman@Absherco.com ESTIMATOR ASSIGN ..read more
Visit website
University of Washington – RFQ – 208606 UWMC NW MOB Gamma Knife – Due 4/23/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
1w ago
Due Date: April 23, 3 PM The University of Washington Facilities (UWF) Project Delivery Group is soliciting Statements of Qualifications (SOQ) from qualified design-build firms to design and construct the UWMC NW MOB Gamma Knife project. Pre-Submittal Meeting: A representative from each design-build firm that intends to submit a SOQ is strongly encouraged to attend and sign-in at the pre-submission meeting schedule for 2:00 PM, April 9, 2024 https://washington.zoom.us/j/93222271014. Project Description: This project installs a new gamma knife in a space that was previously a functioning g ..read more
Visit website
Port of Tacoma – RFB – On-Call Pavement Repairs 2024 072105 – Due 4/10/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
1w ago
Due Date: April 10, 2 PM. Estimated Cost Range: Estimated cost range is Not to Exceed (NTE) $3,000,000, plus Washington State Sales Tax (WSST). Procurement Summary: The Work required for this Project includes: Providing all labor, equipment, and materials necessary for paving, general civil, and fencing, alterations, additions, and repairs when requested by the Engineer on Port of Tacoma property. The Port does not guarantee a certain amount of work. The work will be assigned by Task Orders; each Task Order will address the scope of work and time of completion and shall be performed in accorda ..read more
Visit website
City of Tacoma – RFQ – ORCAS Operations Reporting, Control, and Analysis System PI23-0275F – Due 5/7/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
3w ago
Due Date: May 7, 11 AM Pre-Proposal Meeting: A pre-proposal meeting will not be held. Project Scope: Tacoma Power’s logging and switching and outage management workflow capabilities are insufficient and in need of replacement. Tacoma Power also wishes to modernize with state-of-the-art reporting and analysis and other advanced capabilities. The vendor that is selected for this project will need to: Configure tool to meet the technical specification. Provide training and training documentation. Provide integrations with EMS and ADMS for switching and logging. Estimate: $1,200,000 Click here for ..read more
Visit website
Port of Tacoma – RFB – Video Production and Web Streaming 2024 072096 – Due 4/15/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
3w ago
Due Date: April 15, 2 PM Description: The Port of Tacoma and The Northwest Seaport Alliance (PORT/NWSA) are soliciting proposals from firms interested in providing Video Production and Online Web Streaming services. The PORT/NWSA anticipates awarding 2 personal services contract(s). The period of performance of the contract is three (3) years from the execution of the contract, with options for renewal at the sole discretion of the PORT/NWSA, for a possible total of five (5) years. Estimated Cost Range: Not to Exceed (NTE) $800,000 Click here for more information The post Port of Tacoma – RFB ..read more
Visit website
City of Tacoma – RFQ – Fishing Wars Memorial Bridge B-E Consultant Support Services PW22-0320F – Due 4/9/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
1M ago
Due Date: April 9, 11 AM Project Scope: Project will replace the spans of the Fishing Wars Memorial Bridge eastward of the Puyallup river’s western edge. The Disadvantaged Business Enterprise (DBE) goal for this work is 19%. As this is a federally funded project, the selected firm will be held to Federal EEO requirements. Specifics of the work will include structural and civil design, environmental, survey, grant support, design build RFQ and RFP creation, railroad coordination, utility design, quality assurance, inspection and design-build support services. The City is seeking a highly qualif ..read more
Visit website
Port of Tacoma – RFB – PCT Operational Pavement Repair 2024 072084 – Due 4/3/24
MBDA-Tacoma | Tacoma Buisness Blog
by WA MBDA
1M ago
Due Date: April 3, 1 PM Description: The Work required for this Project includes: Milling and replacement of failed asphalt sections throughout the container yard. Milling will be completed by mechanical mills to a depth of 4-1/2″ with replacement pavement placed in two lifts and finished to match adjacent paved areas. A second potential component of the work includes the placement of concrete collars around utility basin lids. This effort will include saw cutting and removal of the existing asphalt pavement, placement of rebar and concrete in accordance with the specifications. Click here for ..read more
Visit website

Follow MBDA-Tacoma | Tacoma Buisness Blog on FeedSpot

Continue with Google
Continue with Apple
OR